MANILA, Philippines — The government is eyeing the filing of charges against the Discayas over poor structural design and unfinished work of the Philippine Film Heritage Building (PFHB) in Intramuros, Manila, Malacañang said Thursday.

Palace Press Officer Claire Castro discovered the sloppy construction of the film center during her inspection of the PFHB that was supposed to be completed Sept. 4, 2025.
Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building
Castro said the PFHB was built by the Discaya-owned Great Pacific Builders and General Contractor Inc.
"This building should be turned over now because that it's supposedly finished, Sept. 4, 2025. We can see now how it's built and why it's disappointing," Castro told reporters after inspecting the film center.
"And this building, its contractor is Great Pacific Builders and General Contractor Inc. This is one of the corporations of the Discayas," she added.
Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building, This news data comes from:http://ycyzqzxyh.com
- No winner in Grand, Megalotto draws for Aug 27
- Thousands rally in Serbia and accuse police of brutality at anti-government demonstrations
- Comelec probes 15 govt contractors over 2022 election donations
- Trump hails Department of War rebrand as 'message of victory'
- 1.2K pass Electrical Engineers exam
- Israel military says controls 40 percent of Gaza City
- Marcos confers diplomatic merit award on two ambassadors
- One in four people lack access to safe drinking water – UN
- Magnitude 5.3 earthquake rocks Dinagat Islands
- Batangas engineer suspended after alleged bribery attempt on congressman Leviste